Applications

Give the water
a job to do.

Start with the intended use. Explore where recovered water could fit into the way your site operates.

Fit for the purpose

The right water.
For the right use.

Water suitable for one application may not be suitable for another. Source characteristics, exposure, operational needs and applicable requirements all belong in the decision.

Our focus is non-potable reuse. Drinking-water projects follow a different path.

How the requirements take shape
A project connects a water source, its intended use and the requirements between themSOURCEUSESITEMake theconnection.

Look beyond
the connection.

The practical details matter after a system is installed, as well as before.

Demand

How much water does the proposed use need, and when? A consistent source and a seasonal demand may need a different arrangement.

Location

Where will the water be collected, stored and used? Space, access and distance can change the project.

Operation

Who will oversee the system and keep its records? Make the operating responsibilities part of the brief.

Approvals

Which site-specific and regulatory questions need to be resolved? Identify the relevant authorities early.

Further reading: US EPA — Alternative water sources researchhttps://www.epa.gov/water-research/alternative-water-sources-research

What could your
water do next?

You don’t need a finished brief. Tell us where the water comes from and what you have in mind.

Start a conversation